CNC Milling Service Factory
Who is the legal company behind the work
The manufacturer is Dongguan Zhuohang Ltd, also known as Zhuohang Precision Machining Factory, founded in 2005 with business registration 91441900MA4UWT6X39. The plant is at No. 8, Shuibian Songyuan Road, Hengli Town, Dongguan, Guangdong, China 523470. Knowing the legal entity matters: a quote tied to a named, registered company is something you can contract against, and the registration number is one you can confirm. Contact is Felipe Iglesias, reachable at [email protected] or +86 13126536955.
What the facility can actually run
The 6,800 m² plant runs more than 100 machines from Mazak, Brother, Citizen, Star, and Tsugami, covering 3-axis, 4-axis, and 5-axis milling, CNC turning, mill-turn, and precision grinding. That spread is what lets the process be chosen by the part rather than by available capacity. A 100+ staff team supports programming, setup, inspection, and the MES/ERP lot tracking that follows a part through every operation. For you, machine count and brand names are evidence; the useful follow-up is which machine your part runs on and how many setups that implies.
How the factory proves it can mill your part
Because IATF 16949 scope excludes product design under Clause 8.3, this is cutting to your drawing: the factory proves it can hold your drawing rather than redesigning it. Capability is stated as ±0.003 mm milling and ±0.002 mm turning, ±0.002 mm grinding, with process capability Ppk ≥ 1.67 at the initial study on critical characteristics and Cpk ≥ 1.33 in production on general characteristics. The practical test for you is to send a drawing and ask for a first-article report on the critical dimensions — the factory that can produce one is the factory that can run the part.
Lead time and minimum order by complexity
Lead time is quoted against part complexity: 3 days for simple, 7 for standard, and 30 for complex parts. The MOQ is 1 piece, so a prototype and a production batch share the same controlled process. This structure lets you de-risk a design on a single part before scaling, and it tells you the schedule up front instead of after tooling. Complexity, not volume, drives the clock — a one-off complex part still needs the 30-day window.
How the factory verifies material and measurement
Incoming material is verified by XRF against the mill certificate before machining. Dimensional verification uses Hexagon CMMs and a KEYENCE laser microscope; coating and hardness use a Fischer gauge and micro-Vickers tester; salt-spray and tensile testers cover corrosion and joint strength. The certificate set — ISO 9001:2015 (116024/A/0001/UK/En), IATF 16949:2016 (131941/A/0001/SM/En), ISO 14001:2015 (116024/B/0001/UK/En) — is audited by third parties, so the system is checked, not just claimed.
What to send to start
Email your STEP or IGES model and 2D drawing to [email protected], noting material, quantity, and critical features. Expect a review and a quote, usually within one business day, that names the process, the setups, and the lead time your part's complexity implies. The factory's job is to show you it can make the part to print — before you order the run.
What to ask when you audit or visit the plant
If you visit or send an auditor, the useful questions are concrete: which machines run which families of parts, how incoming material is logged and verified, where the CMMs sit relative to the floor, and how a non-conformance is contained and traced. The facility at No. 8, Shuibian Songyuan Road, Hengli Town, Dongguan, Guangdong, China 523470 runs MES/ERP lot tracking, so a part should be traceable to its material lot, machine, and operator. A plant that can walk that chain in person is the plant you can contract with confidence.
With a MOQ of 1 piece and lead times of 3, 7, and 30 days by complexity, the plant supports both a single prototype and a full production run on the same controlled process, so the part you validate first is the part you scale.
How do you match your part to the right machine on this floor?
The machine list matters only when it is matched to a part. A prismatic bracket wants a 3-axis or 4-axis center; a bracket with compound angles wants 5-axis; a round body wants a lathe or a mill-turn; a hardened surface wants a grinder. The factory's spread — 3-axis, 4-axis, and 5-axis milling, turning, mill-turn, and grinding — exists so the machine is chosen by the part, not by what is idle.
Why does the machine spread matter to a milling decision?
A factory with more than 100 machines across milling, turning, mill-turn, and grinding makes the process call on geometry alone. It does not steer a part toward the one machine it owns and hope it works out. The spread is what lets the factory say a part should be turned, not milled, without losing the work — because it can turn it in-house.
How does the MES/ERP system turn a process claim into a record?
A process recommendation is a claim; the MES/ERP system is the evidence. Each lot is logged at every step — material source, machine, program, operator, batch, and inspection result — so the claim that a part was milled to ±0.003 mm is backed by a record you can pull, not a memory you have to trust.
For you the difference is concrete. When a part fails in the field, a record lets the factory contain the problem to one lot, one machine, one operator. Without it, the only safe response is to quarantine everything. The record is what makes a recall containable, and it is the part of the factory you cannot see in a photograph but can always ask to see in a report.
What does the lead time tell you about the process, not just the schedule?
The 3 / 7 / 30-day lead time is a complexity scale, not a queue length. A simple part is three days because it is one setup and one inspection; a standard part is seven because it adds sequencing; a complex part is thirty because the operations run in a fixed order and each waits on the last. When a factory quotes these bands, it is telling you how many process steps your part implies.
How do you verify the process claim during a visit?
A visit is the moment to turn the sales page into something you can touch. Walk the floor and ask concrete questions: which machines run which part families, how incoming material is logged and XRF-verified, where the CMMs sit relative to the floor, and how a non-conformance is contained and traced. The factory at No. 8, Shuibian Songyuan Road, Hengli Town, Dongguan, Guangdong, China 523470 runs MES/ERP lot tracking, so a part should trace to its material lot, machine, and operator on request. A plant that can walk that chain in person is the plant you can contract with confidence.
Why does build-to-print matter when you are choosing a milling factory?
A factory that designs for you and a factory that builds to your print are two different relationships. Because the IATF 16949 scope excludes product design under Clause 8.3, Zhuohang Precision Machining Factory is build-to-print: the drawing is the contract, and the factory proves it can hold it rather than redesigning it. For you, that means the process recommendation comes back tied to your print, and the factory's incentive is to make your part as drawn, not to steer you toward a design it finds easier.
How does XRF at incoming protect your material call?
The material call is made on paper — the mill certificate — but the metal is what actually goes in the machine. XRF verification at incoming checks the lot against that certificate before any cutting begins, catching a substituted or mixed alloy at the door. For a milled part, this is the difference between a tolerance that holds because the material is what you ordered, and a part that measures right and fails in service because it was the wrong grade. Ask whether the factory XRF-verifies at receiving; a yes is a process gate, not a marketing line.
What does a first-article report from this factory look like?
A first-article report is the measured record of the first part off the process: the values on every critical dimension, the datum scheme, the machine and program that ran, and the material certificate cross-checked by XRF. The factory's job is to produce one for your critical dimensions before the run, not after you ask for it.
Ask for a sample first-article report from a comparable job, or order one piece and get the report on your own part. A factory that runs a measured process can produce this without hesitation; one that sends a generic certificate instead is asking you to trust rather than verify.
How do you read the capacity numbers without being misled?
6,800 m², more than 100 machines, and 100+ staff are evidence of scale, not of fit. The number that matters is whether the factory has the right machine for your part, idle or not. So read the capacity numbers as a floor — enough machines that your job is not waiting on one — and then ask the specific question: which machine runs my part, and what is its load. Capacity is what lets the factory hold your lead time; fit is what lets it hold your tolerance. You need both, and they are different questions.
How do you confirm the legal entity before you contract with a factory?
Before a purchase order, confirm the name on the contract matches the name on the certificates. The manufacturer here is Dongguan Zhuohang Ltd, also known as Zhuohang Precision Machining Factory, founded 2005, with business registration 91441900MA4UWT6X39. A named, registered entity is one you can contract against and one whose certificates you can verify with the registrar. If the entity behind a quote is unclear, that is a signal to pause before you send a deposit — a factory that is real is happy to name itself.
What should a first order from a new factory include?
A first order should be small enough to fail safely and specific enough to test the claims. Order one piece of a part with a critical tolerance and a known material, and ask for the first-article report, the material certificate, and the traceability record with the parts. That single order tests the process, the measurement, and the record-keeping in one pass — and it costs a fraction of what a failed production run would. A MOQ of 1 piece exists for exactly this reason: de-risk before you scale.
How does the inspection equipment back the milling tolerance?
A tolerance claim is only as strong as the instrument that checks it. Critical dimensions are verified on Hexagon CMMs, form and micro-features on a KEYENCE laser microscope, coating thickness with a Fischer gauge, and hardness with a micro-Vickers tester. The point is that the ±0.003 mm milling call is checked by an instrument that can measure well below it, not by a caliper at the bench. When a factory names its inspection equipment, it is telling you the tolerance is enforced, not just claimed.
Why does in-house inspection matter to a milling decision?
Inspection that lives on the same floor as the machines closes the loop between a measurement and a correction. When the CMM sits next to the mill, a drift caught at inspection goes straight back to the operator and the program, not into a queue of parts waiting for a third-party report. That loop is what keeps Ppk ≥ 1.67 at the initial study on critical characteristics across a batch rather than on a single lucky part.
How do the certificates map to the process you are buying?
The three certificates cover different things, and knowing which covers what tells you which one matters for your part. ISO 9001:2015 (116024/A/0001/UK/En) is the quality management system. IATF 16949:2016 (131941/A/0001/SM/En) is the automotive extension with the process-control discipline that Cpk reporting comes from. ISO 14001:2015 (116024/B/0001/UK/En) covers environmental management. For a milled part with a critical tolerance, IATF 16949 is the one that matters most, because it is the standard that demands statistical process control rather than just a certificate on the wall.
What is the difference between a certificate and a capability?
A certificate says the system exists; a capability says the process can hold your number. A factory can hold every certificate and still quote a tolerance it cannot produce, because the certificate audits the system, not your specific part. Capability is proven part by part — in the Cpk on your critical dimensions, the first-article report, and the measured values that ship with the parts.
This is why your question should be can you hold my tolerance on this part, rather than are you certified. The certificate is the foundation; the capability is the test on top of it. Ask for both, and judge by the second.
How do you read a quote from a milling factory line by line?
A factory quote worth accepting names the process, the setups, the material grade, the critical dimensions, and the lead time band. Anything less is a price with no plan. Read it line by line: if the process is not named, the factory may be deciding it later; if the material grade is absent, the price may be for a cheaper alloy; if the critical dimensions are missing, the inspection may be spread thin. A complete quote is the first piece of evidence that the factory read your drawing, and it is the document the whole order should be measured against.
Why does a process-matching factory protect your schedule?
When the process is matched to the part up front, the schedule does not get renegotiated in the middle. A factory that picks milling because the part is prismatic, adds turning only when the shape demands it, and reserves grinding for the surfaces that need it, is a factory that planned the route before it promised the date. The lead time you are quoted then holds, because the operations were chosen for the geometry rather than discovered along the way. A schedule that holds is the downstream proof that the process call was made early.
What this shop actually runs
If you ask for capability evidence, you deserve a specific answer. This facility operates 100+ CNC machines across 6,800 m2 in Dongguan, China, staffed by 100+ people. The machines, listed by category:
- 5-axis machining centres (10+) - Mazak VARIAXIS I-600 (510/910/510 mm travel, 12,000 rpm, 22 kW, 71.6 N·m, 30-tool BT40) and Mazak INTEGREX I-250H S (B-axis 0.0001°, 24 kW, 124 N·m, 38-tool HSK-A63). Applied to compound-angle parts, single-setup multi-face prismatic work, and aerospace fittings where datum transfer loss is unacceptable.
- 3-axis / 4-axis machining centres (50+) - Brother SPEEDIO S500Z2N / S700Z2N (10,000 rpm, 14/21-tool ATC, 0.7 s tool-to-tool, Z-axis 2.2 G) and Mazak VCE-430A L / VCE-570C L (10,000 rpm, 118 N·m, 24-tool ATC). Applied to prismatic parts, plates, brackets, housings.
- Swiss-type turning centres (10+) - Citizen Cincom A20-3F7 (Φ20 mm, 10,000 rpm), TSUGAMI B0206-III / B0205-III (Φ20 mm, 0.1 µm), STAR SR-32JII / SR-32J Type N (Φ32 mm, 8,000 rpm). Applied to long, slender rotational parts at ±0.002 mm.
- CNC turning centres (20+) - HEADMAN T70M/1250 (720 mm swing, 117 mm bore, 3,000 rpm, BMT75 12-station turret). Applied to shafts, bushings, flanges up to ±0.002 mm.
- Wire EDM (5+) - Sodick AQ535L (550/350/300 mm travel, ±20° taper, 800 kg workpiece). Applied to hardened tool steel, internal splines, sharp internal corners that milling cannot reach.
- Inspection: Hexagon CMM + 20+ gauges - Hexagon CMM for coordinate measurement, plus vision system, profilometer, hardness tester, coating thickness gauge, XRF for material verification. The 10:1 rule (gauge 10x more accurate than the band) is applied to every feature.
- Machine highlights - VARIAXIS I-600: one-setup multi-face 5-axis + MAZA-CHECK auto-calibration; INTEGREX I-250H S: DONE-IN-ONE mill-turn, B-axis 0.0001° + Ai thermal shield; SPEEDIO S500Z2N / S700Z2N: Z-axis 2.2 G + 0.7 s ATC; Swiss-type: guide-bush switchable + 0.1 µm resolution.
Tolerance bands: ±0.003 mm milled, ±0.002 mm turned, ±0.002 mm ground or wire-cut. Capability indices: Ppk >= 1.67 at the initial study; Cpk >= 1.33 ongoing in production.
Certifications: ISO 9001:2015 (116024/A/0001/UK/En) · IATF 16949:2016 (131941/A/0001/SM/En, design clause 8.3 excluded) · ISO 14001:2015 (116024/B/0001/UK/En), held by Dongguan Zhuohang Ltd (USCC 91441900MA4UWT6X39, since 2005).
Service area: we supply Austria, Belgium, the Czech Republic, Denmark, France, Germany, Greece, Hungary, Ireland, Italy, the Netherlands, Spain, Sweden and the United Kingdom in Europe; Brazil, Canada, Mexico and the United States in the Americas; China, Israel, Japan, Singapore and Sri Lanka in Asia; Australia and New Zealand in Oceania; and South Africa in Africa, with worldwide delivery from China.
Contact: Felipe Iglesias, [email protected], +86 13126536955.
Send your drawing for a quote.
Email [email protected] or call +86 13126536955 for a review and quote.


Frequently Asked Questions




Who is the legal company behind the brand?
In short, The marketing brand is operated by Dongguan Zhuohang Ltd (brand name Zhuohang Precision Machining Factory), registration number 91441900MA4UWT6X39, founded in 2005 and headquartered in Hengli Town, Dongguan, Guangdong, China.
How does your MES/ERP system work?
Our MES/ERP system is integrated with production and records raw material source, process parameters, machine data, batch, machining time, operator, and inspection results on every lot.
How large is the factory and how many machines does it run?
The facility covers 6,800 m² and houses 100+ production machines — 3-axis (50+), 4-axis (20+), 5-axis (20+), 25+ lathes, and 7+ grinders — plus 20+ inspection instruments.
What tolerances can the factory hold?
±0.003 mm on CNC milling, ±0.002 mm on CNC turning, and ±0.002 mm for precision grinding. We verify critical dimensions on Hexagon CMMs, with process capability Ppk ≥ 1.67 at the initial study on key characteristics.
What certifications does the factory hold?
Yes. We hold ISO 9001:2015, IATF 16949:2016, and ISO 14001:2015. IATF 16949 scope excludes product design under Clause 8.3, so we are a build-to-print manufacturer.
Can I visit the factory?
Yes. We welcome factory visits at our Hengli Town, Dongguan address. A visit lets you verify the MES/ERP system and the inspection bench before you commit.
How do I contact the factory?
Email [email protected] or call +86 13126536955. Send your drawing and you will get a review and a quote, usually within one business day.
Continue reading: CNC Milling Services · CNC Milling Service · CNC Milling Service Parts Manufacturer
Standards referenced on this page
- ASTM A582/A582M-12 — Standard Specification for Free-Machining Stainless Steel Bars
- ISO 14001 — Environmental management systems — Requirements with guidance for use
- IATF 16949:2016 — Automotive quality management system standard
Business conduct and due diligence
We operate in full compliance with all applicable laws and regulations. Suppliers are paid on agreed terms and wages are paid in full and on time. Every full-time employee receives the statutory benefits required by law. We support local community development through charitable donations.
Our legal and regulatory record is publicly verifiable in China, with no material litigation or enforcement action involving customers, suppliers, employees, authorities, or other third parties. Buyer-side due diligence is welcome.
